Transaction reference / IP41
IP41 Create Single-Cycle Plan
Fixed-interval plan (e.g., transmitter calibration)
- Process step
- 4 Maintenance plans
- Discipline
- I&E
- Course module
- M4 / M6
- Verified
- Yes
- ECC vs S/4HANA
- GUI; Fiori Manage Maintenance Plans (F5325); Fiori app IDs S/4HANA only, not ECC Unverified
Used in lessons
Behavior varies by release and site configuration. Your site's configuration and procedures override this reference.