Resources / Case study: PM task list cleanup
Case Study 2 (Outline): Reviewing PM Task Lists and Maintenance Plans
DRAFT · unverifiedStatus: DRAFT outline. Placeholders only. Follows Playbook DRAFT v0.2 (rules 5 and 6, section 5). Do not publish until every placeholder is filled from a real, permitted source. Audience: Mechanical / Instrumentation & Electrical (I&E) / Both TBD: owner to supply Product used: TBD: owner to supply, e.g., preventive maintenance (PM) program review consulting, template packs, team license
1. Headline
TBD: owner to supply, written from the real result, no superlatives.
2. Who
- Organization type: TBD: owner to supply, anonymized unless approved
- Team involved: TBD: owner to supply, e.g., planners, reliability engineers, craft leads
- Equipment scope: TBD: owner to supply, e.g., rotating equipment, instrumentation, electrical, described generically
- [EMPLOYER REVIEW: owner to confirm this subject has no link to the owner's employer or its contractors.]
3. Starting point
- Problems the team reported with their PM task lists and plans: TBD: owner to supply
- How the problem showed up in the field: TBD: owner to supply
4. What they did
- Review approach: TBD: owner to supply
- Templates used: TBD: owner to supply, e.g., task list template
- SAP Plant Maintenance (SAP PM) areas reviewed: TBD: owner to supply, e.g., task lists, maintenance strategies, maintenance plans and scheduling, using only codes in the course transaction reference
- Mechanical vs I&E differences found: TBD: owner to supply
- Safety-critical PM handling, e.g., safety instrumented system (SIS) proof tests: TBD: owner to supply. Interval changes go through the site's management of change (MOC) process, never through the planner alone.
5. Results
- Qualitative change: TBD: owner to supply
- Measured result (optional): TBD: owner to supply, only if measured, with definition, period and data source; otherwise delete this line
6. Quote
TBD: owner to supply, a real quote with written permission, or leave this section out.
7. Permission and review checklist
- Written permission on file for names, titles, quotes and numbers
- No confidential task lists, plans, tags, screenshots or documents
- [EMPLOYER REVIEW: owner checked for any employer link or employer-specific detail]
- Owner verified all technical statements
- Disclaimer added (see README)
Verification log
- Verified by: [owner] | Date: [ ] | Notes: [ ]